MontrealInstallation of assembled cold storageSense of value of rational choice

632HP195506591   ·  2022-04-24 06:55:11   ·   energy

It is strictly prohibited to place articles with pollution and peculiar smell around the cold storage. The surrounding environment of the cold storage must be cleaned and disinfected regularly every day, and the door of the cold storage must be locked.When the cold storage is used for the first time or shut down for a long time it is strictly prohibited to stack goods in the warehouse. The warehouse must be slowly reduced to the required temperature. For the low-temperature warehouse, it needs to be cooled in stages to avoid sudden changes in the temperature difference inside and outside the warehouse, resulting in the warehouse body.Montreal,After the installation of the controlled atmosphere storage, the temperature is too low, perhaps because the unit is too large, which leads to the rapid decline of the air temperature in the controlled atmosphere storage. However, it can be found that the temperature of the goods is still at a high level, or perhaps because the thermal insulation effect of the controlled atmosphere storage is relatively poor after the installation of the controlled atmosphere storage, then the heat dissipation will be accelerated, This phenomenon may be caused by the poor quality of the selected modified atmosphere storage board. It is suggested that when selecting the modified atmosphere storage board, we must pay attention to its thickness. Only the modified atmosphere storage board with the required thickness can have a certain thermal insulation effect.The construction structure of structural cold storage can be brick concrete structure or steel structure, which can be determined according to their own budget and actual needs. At present, most cold storages are constructed with single-layer steel structure, and are equipped with combined thermal insulation storage body, unloading platform, refrigeration system, system, pipeline system, etc. according to the actual needs of cold storage circulation.Otsu ,Danfoss thermal valve is adopted for the thermal valve of the cold storage, with guaranteed quality; Due to the high temperature requirements of the cold storage and the high degree of automation and regulation of the temperature, the temperature system of the cold storage adopts microcomputer full-automatic, does not need special people to operate, and can be remotely controlled. When the temperature exceeds the specified range, it will automatically alarm which is of great significance to the proper preservation of the cold storage.The lights in the warehouse are not on. Please check whether the switch fails and whether the bulb is damaged. Cut off the power supply when installing the lampshade, and pay attention to the waterproof of the lamp.No matter whether the food cold storage or quick-frozen storage is in use, it is inevitable that there will be various small faults. Don't be nervous when there are problems. You can find or eliminate problems according to the knowledge taught today.


MontrealInstallation of assembled cold storageSense of value of rational choice



The assembled cold storage body often adopts double-sided color steel plate of polyurethane thermal insulation material, more important is the choice of refrigeration system. For example, the refrigeration system of fluorine refrigerant is still the mainstream, but when selecting the type and power of cooling equipment,MontrealInstallation of cold storage works, it is necessary to calculate the data for the installation of cold storage, and then make a high-quality choice.During the welding of refrigeration pipeline, a blowdown outlet shall be reserved to blow the sewage from high and low pressure with nitrogen in sections. After the sectional blowing is completed, the whole system shall be blown until no dirt is found. The blowdown pressure is .MPa.Preparation, prepare the project planning of cold storage, and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements, and start the installation of cold storage after confirmation.Excellent service check the material quality and model,The insulation board of the cold storage adopts polyurethane double-sided color steel plate. The main effect of this cold storage insulation board is good sealing performance,MontrealManufacturer installing large cold storage, insulation effect and moisture-proof effect, so as to ensure the refrigeration effect of the cold storage. The electric cold storage door is adopted for the cold storage door, and the cold storage management personnel can timely and effectively open and close the door when entering and leaving, so as to avoid the loss of refrigeration capacity of the cold storage.Generally, in the actual operation of the refrigeration system, because the temperature conditions are constantly changing, only by relying on the careful operation of the cold storage management personnel and accurately adjusting the operation of the refrigeration equipment of the cold storage, can the refrigeration system always be in the ideal working state and achieve the effect of energy saving.The foundation of cold storage is affected by low temperature, and the water in the soil is easy to be frozen. Due to the volume of frozen soil, the ground will be broken and the whole building structure will be deformed. If the damage is serious, it may even make the cold storage unusable. Therefore, in addition to the thermal insulation layer the floor of low-temperature cold storage must be treated under the thermal insulation layer to prevent soil freezing. The bottom plate of the cold storage shall stack a large number of goods and pass through various loading, unloading and transportation machinery and equipment. Therefore, the structure of the cold storage plate shall be firm and have large bearing capacity. In low temperature environment, especially in the process of periodic freezing and thawing cycle, building structures are vulnerable to. Therefore, the structure of each part of the cold storage and the building materials of the cold storage should have sufficient frost resistance.


MontrealInstallation of assembled cold storageSense of value of rational choice



The water tank is designed to be separated from the machine body and is double-layer. It will not drip due to condensation caused by internal and external temperature difference. It can be interlocked with the refrigeration system, that is, it will not be humidified during refrigeration to prevent serious frosting of the fan.Inspection basis,Secondly, since the cooling of the compressor is not continuous, the multi work operation at night can be selected if possible. When working at night, the external temperature is low, the cooling water temperature is reduced, and the condensation pressure and condensation temperature are reduced. The cooling capacity of the sampling system, coupled with the equal role of the cold storage board, reduces the power operation of the compressor and achieves the purpose of energy saving.The refrigerator room with high-voltage cabinet and distribution cabinet shall be equipped with special tools and protection for high-voltage operation.The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.Montreal,Preparation prepare the project planning of cold storage, and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements, transport all installation materials to the construction site, check the material quality and model, and start the installation of cold storage after confirmation.When opening and drilling is required for the top warehouse plate or wall plate, the internal and external setting out and positioning shall be carried out according to the drawing design requirements, and the opening and drilling shall be carried out after review; The inlet hole, liquid inlet hole, return hole, water supply hole and drainage hole shall be opened with a hole opener. Construction treatment shall be carried out in time after opening and drilling, and the orifice shall be closed with foaming material or sealant to prevent air leakage and cold running; The door, vent and delivery port shall be decorated with wrapped edges and fixed with pull rivets, with a spacing of mm and mm outside.Step of cold storage design: define the volume of the cold storage warehouse. The size of the cold storage should be based on the design of a large number of agricultural products to be stored for a long time. This volume is calculated based on the essential volume of stored goods accumulated in the cold storage, plus the row to row corridors, the indoor space between the pile and the wall, the ceiling and the gap of the packaging house. After the volume of the cold storage is determined, such as working intermediate, packaging and combing room,MontrealWhich is a good cold storage installation manufacturer, special tool warehouse, loading and unloading platform, etc.

4 Replies   |  until 2022-04-24 06:55:11 | 166 Views

Technology transfer and sales 2022-04-24 07:49:46 support  0 | be opposed to  0

So give praise! Just received the goods, very good, MontrealInstallation of assembled cold storage great value for money! ! Come in the future!

hydrogen 2022-04-24 07:09:39 support  0 | be opposed to  0

When MontrealInstallation of assembled cold storage offer discount points for activities, contact me when there are discounts

Production of medical dye intermediates 2022-04-24 07:30:16 support  0 | be opposed to  0

Follow you MontrealInstallation of assembled cold storage for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected. The boss praised it.

FRP product sales 2022-04-24 08:48:34 support  0 | be opposed to  0

Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, MontrealInstallation of assembled cold storage basically satisfied.
Log inContent can only be published later