St AlbertWhere is the cold storage installedOperating procedures

632HP195506591   ·  2022-04-30 04:30:26   ·   energy

The foundation of cold storage is affected by low temperature, the ground will be broken and the whole building structure will be deformed. If the damage is serious, it may even make the cold storage unusable. Therefore, in addition to the thermal insulation layer, the floor of low-temperature cold storage must be treated under the thermal insulation layer to prevent soil freezing. The bottom plate of the cold storage shall stack a large number of goods and pass through various loading, unloading and transportation machinery and equipment. Therefore, the structure of the cold storage plate shall be firm and have large bearing capacity. In low temperature environment, especially in the process of periodic freezing and thawing cycle building structures are vulnerable to. Therefore, the structure of each part of the cold storage and the building materials of the cold storage should have sufficient frost resistance.For the flushing (thawing) drainage pipe in the cold room with different temperature, an exhaust valve equipment shall be set before connecting the flushing (thawing) drainage pipe.St Albert,Air volume regulation is the key factor to save energy. If we can do this well the energy-saving effect of the fan can be determined. After effective adjustment, the fan can meet the flow or pressure requirements of production under the stable working conditions, and can save energy to the limit. In the process of implementing fan regulation, it is important to choose what regulation, which can directly affect the energy-saving effect of controlled atmosphere storage.Moreover,There are many kinds of cold storage. According to the material, it can be divided into color steel plate, stainless steel plate and salted steel. Among them, color steel plate has strong anti rust ability, but stainless steel plate has strong anti rust ability, while salted steel has both beautiful appearance and anti rust ability. According to the layout, it is divided into flat plate and wave plate. The former is flat after the surface material is formed, the thickness of stainless steel is .mm and mm, without color requirements; The thickness of salted steel plate is .mm, without color requirements; The thickness of PE paint baking board is .mm, .mm ivory white, titanium white and white gray. The most important thing for the cold storage is the applicable temperature of the cold storage. It is divided according to the insulation thickness of the storage plate. The thickness of the sky floor of the mm storage plate is mm,St AlbertCold storage engineering installation manufacturer, and the thickness of the vertical plate is mm and mm, which is suitable for the insulation conditions of - ℃ ~ - ℃; mm storage plate: the thickness of the ceiling plate is mm and the thickness of the vertical plate is mm, which is suitable for the thermal insulation conditions of ℃ ~ - ℃. The thickness of the ceiling plate and the vertical plate of mm storage plate is mm, which is suitable for the thermal insulation conditions above ℃. In fact, there are many other classification methods of cold storage. Determined by the current processing technology, it can be divided into standard plate and non-standard plate according to the width and size range of warehouse plate, including standard plate vertical plate width wa = mm, heaven and earth plate width WB = mm, vertical angle plate W = mm, W = mm, W = mm and W = . The dimensions of non-standard plates are different from those of Wa, WB and W.Cold storage has strong stability. Polyurethane foam technology makes it have superior bonding performance. The firm combination of polyurethane rigid foam and carrier layer is the basic premise to ensure the stability of external insulation layer. That is, under the unfavorable local temperature and humidity conditions, the characteristics of the cold storage still do not separate and fall off from the carrier layer and remain stable under normal conditions.Large space rate of quick-frozen warehouse: for quick-frozen warehouses of the same size, reasonable design schemes store more goods than unreasonable ones. For the fixed size quick freezing warehouse, how to design it to maximize its space rate is often an important problem considered by our designers. In the design scheme of Lukang medical quick-frozen warehouse, we reasonably designed to expand the original storage capacity of boxes to boxes, which increases the space a lot.


St AlbertWhere is the cold storage installedOperating procedures



Before the acceptance and delivery of the project, the board surface shall be wiped clean. If there is any scratch, it shall be treated. There shall be no obvious scratch on the board surface.Frequently check and acknowledge whether the voltage of the power supply meets the requirements, and the voltage should be V & plusmn; % (phase line). When the fresh-keeping warehouse equipment is not used for a long time, the main power supply of the fresh-keeping warehouse shall be cut off, and it shall be ensured that the fresh-keeping warehouse equipment is not affected by moisture, dust and other substances. The condenser on the refrigeration unit is simply contaminated, and the fresh-keeping warehouse shall be cleaned regularly according to the actual situation. To adhere to outstanding heat transfer.Cold storage construction: which one is suitable for you? Which one is suitable for you?Test method,The combined cold storage door starts frequently or does not start for a long time, the uneven part shall be leveled with materials or stops before the storage temperature reaches. - precautions for floor installation of cold storage: the floor shall be installed flat, and the locking hook between the plates shall be locked to ensure that the warehouse surface is flat without hollow feeling. (note that if this drainage system is installed outdoors in the north, the drainage pipe shall be insulated).General quick-frozen warehouses are mostly cooled by refrigeration mechanism with low gasification temperature (ammonia or Freon)


St AlbertWhere is the cold storage installedOperating procedures



The cold storage shall be regularly overhauled and maintained, so as to reduce the failure rate of the refrigeration unit and achieve good refrigeration effect.production costs,The installation of top warehouse plate should be carried out alternately with the installation of wall plate, and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate, the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be mm; According to the design drawings, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam,St AlbertQuotation for installation of small cold storage, column, support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.The electrical contacts shall compress the wire connector and the main wire connector of the motor, which shall be clamped with a wire clamp and tin shall be hung if necessary.Application of parallel compressor in cold storage: the requirement of refrigeration capacity is large, large load peak valley difference and significant departmental load; Frozen and refrigerated objects are novel foods that are easy to decay and degenerate and to refrigeration compressors under Malige need to be used on weekdays; Long term operation, and have strict requirements for temperature and humidity.St Albert,The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body,St AlbertFrozen preservation, and the professional cold warehouse shall be installed. The cold warehouse shall be installed. The cold warehouse shall be constructed. The fruit fresh-keeping cold warehouse and medical cold warehouse shall have high pressure rating, fire and high temperature resistance, strong overload capacity, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with . color plate angle steel; When installing each wall panel, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, and the rivet spacing in the warehouse should be mm; When connecting the library plate in the form of eccentric hook connection, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.There are two kinds of refrigeration in the cold storage group: immediate refrigeration and simple refrigeration.Another reason is that there are many refrigerants in the system. In this case, find the leakage point first, focus on the connection of each pipeline and valve, repair the found part, and then fill in sufficient refrigerant.

2 Replies   |  until 2022-04-30 04:30:26 | 116 Views

hydrogen 2022-04-30 12:27:50 support  0 | be opposed to  0

The first online purchase St AlbertWhere is the cold storage installed. I use my personal experience to tell everyone that your service attitude is very good. The quality of the goods is also very good. I like you!

Metalworking Machinery 2022-04-30 12:46:30 support  0 | be opposed to  0

The first time I found what I wanted St AlbertWhere is the cold storage installed, I was in a good mood! Boss, come on, I hope to continue to make good products.
Log inContent can only be published later