DelmasGrouting pipeWhat are the advantages of using thermal division

263HP145816628   ·  2022-11-01 12:37:56   ·   Electronic Component

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, aerated silicification method and electric double liquid silicification method.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.

DelmasGrouting pipeWhat are the advantages of using thermal division


After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.DelmasGrouting pipeWhat are the advantages of using thermal division, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand,DelmasSteel pipe, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.

DelmasGrouting pipeWhat are the advantages of using thermal division


The secondary grouting pipe can only be grouted once and cannot be reused.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Delmas,Trapani,It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory old brand,DelmasPrecision tube, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

2 Replies   |  until 2022-11-01 12:37:56 | 81 Views

Dongxiao Power Technology Co., Ltd. 2022-11-01 13:03:12 support  0 | be opposed to  0

Happy cooperation and tight packaging. Let’s talk about business services: Like

Labor subcontracting 2022-11-01 13:33:04 support  0 | be opposed to  0

Thank you faithfully, let me buy the dream DelmasGrouting pipe, thank you so much!