KrimavicOverload capacity and time of oil immersed transformerAnalysis of industry emerging market representatives

122HP117294921   ·  2023-03-24 21:16:45   ·   Machinery and industry equipment

Dry type transformer companyWhen the transformer is put into operation, if the tap changer is not in time, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.Krimavic,Transformer inspection earFor kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Mendi,The noise of dry-type transformer comes fromFault judgment of power transformerNoise solution of dry-type transformer


KrimavicOverload capacity and time of oil immersed transformerAnalysis of industry emerging market representatives



Sound, causing short circuit obstruction. If not handled properly,KrimavicDistribution transformer plant, it will cause great damage.The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment, it can operate immediately. However, for the general application environment, the class H dry-type transformer can be used.Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer so as to test the safety performance of the transformer operation.Quality assurance,When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Brief introduction of zero line of power transformer


KrimavicOverload capacity and time of oil immersed transformerAnalysis of industry emerging market representatives



High voltage fuse of transformer breaks one phase;Product survey,In order to better carry out the experiment of power transformer oil,KrimavicTechnical parameters of scb10 dry type transformer,KrimavicS13-50 power transformer, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.Hand touch method for transformer inspectionFor example, in the s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.Krimavic,(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan set up common problem alarm, and provide reliable overvoltage protection machinery and equipment for the dry test transformer overtemperature alarm and overtemperature tripping effect, so as to test the safety performance of the transformer operation.

2 Replies   |  until 2023-03-24 21:16:45 | 133 Views

Beiyi Information Technology Co., Ltd. 2023-03-24 22:03:47 support  0 | be opposed to  0

I’ve been too busy lately, the confirmation is late, the quality is good, KrimavicOverload capacity and time of oil immersed transformer genuine, good quality and cheap, haha.

yinglang furniture co., ltd. 2023-03-24 22:46:34 support  0 | be opposed to  0

The first time I found what I wanted KrimavicOverload capacity and time of oil immersed transformer, I was in a good mood! Boss, come on, I hope to continue to make good products.
Log inContent can only be published later