WellandDirect transformerWhat are the steps used for beauty

122HP117294921   ·  2022-04-21 09:05:04   ·   Machinery and industry equipment

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Causes of fire in power transformerWelland,The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;What is the reason for the shutdown of power transformer?Do Gonbadan,Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable,WellandWaste power transformer, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately,WellandSpecification of oil immersed transformer, and each pump is driven by kW motor, so the usual load is KW, CST = . One kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only %The main reason is that the welding quality of electric welding is poor, there are empty welding open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.Management Department, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found,WellandDry type transformer procurement, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.Connection group structure of dry-type transformer


WellandDirect transformerWhat are the steps used for beauty



Power transformers are used in all walks of lifePromise and keep promiseHigh voltage fuse of transformer breaks one phase;The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by kW motor, so the usual load is KW, CST = . One kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only %Dry type transformer companyWelland,The bearing capacity of each load is different. Generally dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Loose core screw

0 Replies   |  until 2022-04-21 09:05:04 | 101 Views
Log inContent can only be published later