KurikaPower transformer test reportControl issues to consider

122HP117294921   ·  2023-03-09 13:45:33   ·   Machinery and industry equipment
KurikaDetailed structural drawing of dry-type transformer,

(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.What is the reason for the shutdown of power transformer?Kurika,The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator,KurikaModel of oil immersed transformer, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.BenoyThe first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.Analysis of common faults of oil immersed transformer:The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.


KurikaPower transformer test reportControl issues to consider



There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Hand touch method for transformer inspectionThe insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection,KurikaHigh frequency power transformer, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.market price,Oil leakage of bolt or pipe external threadAfter the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.


KurikaPower transformer test reportControl issues to consider



According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.For more, please check,Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.The insulation of the through core anchor bolt clamping the iron core is damaged, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;Kurika,Sound in case of phase failureThe zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, it will be grounded from the surrounding grounding body.& ldquo; YN the current will be quickly grounded. Even if there is a lead for the PE line, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand refers to the position at o'clock, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).

5 Replies   |  until 2023-03-09 13:45:33 | 252 Views

Chenglong HVAC Equipment Technology Co., Ltd. 2023-03-09 14:33:03 support  0 | be opposed to  0

I finally received what I needed KurikaPower transformer test report, the stuff is very good, the price is good and the price is cheap, thank you boss! To be honest, this is my most satisfying shopping experience. Whether it is the attitude of the store or the items, I am very satisfied. The attitude of the store is very professional and enthusiastic, answering all questions, and the response is very fast. I asked a lot of questions, and he did not feel annoying, and he would answer me seriously. For this, I would like to express my sincere respect to you. There are not many good stores like this. .

Tuoken Trading Company 2023-03-09 16:13:03 support  0 | be opposed to  0

The seller is really good, KurikaPower transformer test report is the same as the introduction, honest seller

Elderly care 2023-03-09 14:33:09 support  0 | be opposed to  0

I want to change a supplier and see you on the Internet, can I give a detailed explanation KurikaPower transformer test report

Installation of multimedia teaching equipment 2023-03-09 15:02:41 support  0 | be opposed to  0

Can you give me a discount next time I buy it, KurikaPower transformer test report The quality is good, and I will live up to the boss

570HP155642700 2023-03-09 14:43:54 support  0 | be opposed to  0

Sure enough, you get what you pay for, KurikaPower transformer test report is super good, the quality is very good, thank you!
Log inContent can only be published later