portland Container boarding bridgeDocumentary on the high-quality development of the materials industry

161HP196399230   ·  2024-03-23 01:24:21   ·   Machinery and industry equipment

It is strictly prohibited to apply excessive pile loads around the foundation pit.Install a m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate,portland Buy hydraulic boarding bridge, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow' Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.portland ,Maintain the hydraulic system of the hydraulic boarding bridge. Keep the hydraulic oil of the hydraulic boarding bridge clean: Store the oil in a clean location, and be careful when changing or refueling. Only use a cleaning funnel equipped with a fine mesh filter to pour oil from the container into the oil tank. Of course,portland Mobile boarding bridge, the oil you use should be the type recommended by the equipment manufacturer.Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.El Tigre,Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque and be more robust than other channel structures.


portland Container boarding bridgeDocumentary on the high-quality development of the materials industry



The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, usually the width of the electric hydraulic boarding bridge is mm, mm, and mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.Applicable scenario: Suitable for mobile high-altitude operations such as setting and inspection of high-altitude equipment in various industries.What should I pay attention to when choosing a boarding bridge? The selection and purchase of the boarding bridge involves paying attention to three issues, including its range of use, rated load, and other factors; Their understanding of the manufacturer of the boarding bridge, whether their enterprise qualifications, special equipment licenses are complete, how many after-sales service outlets are there in the country, how about their after-sales service attitude, and whether they are timely; The important point is whether the quality is good or not, you can choose the products of the manufacturer.Create brilliance,When working on the hydraulic boarding bridge, the support legs must be extended, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every hours of operation.Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on press the up button, motor rotates but lifting platform does not rise, lowering valve is open, oil level is too low, oil pump is empty, oil suction filter is blocked,portland Retractable boarding bridge, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at % rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


portland Container boarding bridgeDocumentary on the high-quality development of the materials industry



When it comes to fixed hydraulic boarding bridges, I believeGood reputation,The pressure on the axle will reduce the service life of the boarding axle.B) When maintaining the hydraulic system, only clean plastic plugs can be used to seal the ends of the pipeline.Shake the handle to raise the boarding bridge to the height of the container.portland ,Open the manual valve, slowly lower the boarding bridge and secure more than % of the lip plates at the bottom of the container.When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.


0 Replies   |  until 2024-03-23 01:24:21 | 15 Views
Log inContent can only be published later