LesbridgeHow much is the installation and construction cost of cold storageHow do enterprises stand out

632HP195506591   ·  2022-04-26 02:22:16   ·   energy

Quick freezing storehouse is widely used. There are many kinds of temperature in quick freezing storehouse, the original cold storage for the purpose of product storage can no longer meet the rapid,LesbridgeCold storage installation where to find, accurate and small batch circulation needs of modern commodities. Therefore,LesbridgeHow much is the cold storage, the logistics center cold storage cold chain for the purpose of product distribution came into being and developed rapidly, playing a more and more important role in the commodity circulation chain. What are the characteristics of the rapid development of cold storage construction?Lesbridge,  & amp; ldquo; Door to door & amp; amp; rdquo; & amp; amp; ldquo; Door to door & amp; amp; rdquo; Loading and unloading operation is the main operation mode to realize cargo circulation in logistics cold storage engineering.After being stored in the medical cold storage project, ventilating medical products may also emit some odors. Once these odors are stored in a certain quantity, they will also have a certain impact on other products. Therefore, we must carry out regular ventilation in the process of daily use, so as to effectively reduce the storage time of products. If the medical cold storage project uses row tube refrigeration, the image of frosting may appear after use for a period of time. If we do not defrost in time, it will also affect the effect of. Therefore, I hope you must pay attention to defrosting.Kribi,The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.Regular oil discharge, descaling and air discharge: when there is a .mm thick oil film in the evaporator coil, in order to maintain the set temperature requirements, the evaporation temperature will decrease by ℃ and the power consumption will increase by more than ; When the scale on the water pipe wall in the condenser reaches mm,LesbridgeFruit cold storage installation company, the condensation temperature will rise by ℃ compared with the original temperature, and the power consumption will increase. When the refrigeration system is mixed with non condensable gas and its partial pressure reaches .mpa, the power consumption will increase by about . It can be seen that it is coldIt is required to set up a special tally room (area), and the temperature of the tally area is usually controlled at ~ + ℃.


LesbridgeHow much is the installation and construction cost of cold storageHow do enterprises stand out



When outdoor air enters the cold storage body, it will not only increase the cold consumption of the cold storage, especially the heat insulation structure, being damaged by moisture and freezing. Therefore, a moisture-proof and heat insulation layer should be set to keep the cold storage board building moisture-proof and air-proof performance and good sealing.Specific functional characteristics of fresh machine.The construction of small cold storage is widely used in life, manufacturing industry, etc. since cold storage is so widely used, do you know cold storage? Especially the construction process and steps of cold storage. Understanding the construction process and steps of cold storage is helpful for all links of cold storage maintenance.Affordable price,Polyurethane with good fire resistance and flame retardancy is a kind of refractory and self extinguishing material after adding flame retardant. In case of fire, it can be carbonized, unlike flow burning and flashover like extruded board, which can effectively prevent fire spread. In particular, it can be sealed as a whole after systematic fire prevention treatment to form non combustible products.Cold storage plate features: good thermal insulation performance, light weight, high strength, corrosion resistance, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator beautiful appearance. - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, make the drainage pipe in advance, and make U-bend and silica gel outside the storage.


LesbridgeHow much is the installation and construction cost of cold storageHow do enterprises stand out



Pay attention to the energy saving of the lighting system: the lighting of the cold storage should be considered comprehensively according to the area, height and warehouse temperature of the cold storage on the basis of safety, science and rationality, from the perspective of energy saving and environmental protection. The lighting in the cold storage is concentrated in the working area.How much is it,Polyurethane spraying is widely used in large and medium-sized refrigerators. Different well-known brands are produced at different prices, and the product quality is relatively large. However, it is not high-quality or good goods. This is the result of long-term cooperation.Protective fence shall be set around the door of the controlled atmosphere storage with eye-catching signs. - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance, and make U-bend and silica gel outside the storage.Lesbridge,Moreover, polyurethane does not produce harmful gas at high temperature.Judge the operating sound of the compressor, and carefully listen to the operating sound of water pump, cooling tower, compressor, fan and other equipment. In case of abnormal sound, timely warranty is required, so as to avoid greater damage to the compressor due to untimely warranty.Various construction materials such as material certificate, carefully shall be carried out simultaneously with the project construction test report and stage acceptance record, timely, accurately and comprehensively reflect the whole process of production and construction, and actively cooperate with the owner in design change and technical negotiation.

0 Replies   |  until 2022-04-26 02:22:16 | 94 Views
Log inContent can only be published later