Paris Charles de Gaulle AirportTransformer power supply applicationReducing power consumption is the key

122HP117294921   ·  2023-03-12 13:46:34   ·   Machinery and industry equipment

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.Paris Charles de Gaulle Airport,With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.SandpaperWhat about oil immersed transformer fire?Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction, chemical enterprises and factories.


Paris Charles de Gaulle AirportTransformer power supply applicationReducing power consumption is the key



When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand,Paris Charles de Gaulle AirportAdvantages and disadvantages of oil immersed transformer, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.Product range, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.


Paris Charles de Gaulle AirportTransformer power supply applicationReducing power consumption is the key



The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.original,Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than %, there is generally no problem. However,Paris Charles de Gaulle AirportProduction process of oil immersed transformer, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.The tap changer of power transformer shall also have strong insulation. kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.Paris Charles de Gaulle Airport,Paris Charles de Gaulle AirportHigh voltage bushing of oil immersed transformer, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.

5 Replies   |  until 2023-03-12 13:46:34 | 305 Views

Shengjing Construction Engineering Company 2023-03-12 15:52:09 support  0 | be opposed to  0

The seller is really good, Paris Charles de Gaulle AirportTransformer power supply application is the same as the introduction, honest seller

Sanshi Lighting Design Company 2023-03-12 15:18:30 support  0 | be opposed to  0

Can you give me a discount next time I buy it, Paris Charles de Gaulle AirportTransformer power supply application The quality is good, and I will live up to the boss

bracket 2023-03-12 14:46:47 support  0 | be opposed to  0

The logistics is very fast, look forward to working together again

Construction of tunnel works 2023-03-12 15:55:35 support  0 | be opposed to  0

Just received the goods, very good, Paris Charles de Gaulle AirportTransformer power supply application great value for money! ! Come in the future!

Subway evacuation platform and support 2023-03-12 15:58:39 support  0 | be opposed to  0

The logistics of Paris Charles de Gaulle AirportTransformer power supply application is a bit slow. Overall it's good, I hope I have a chance to cooperate next time
Log inContent can only be published later