VannTransformer inductorBecome the industry's new normal

122HP117294921   ·  2023-03-25 22:43:46   ·   Machinery and industry equipment

Operation and maintenance management of oil immersed transformerFor the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.Vann,Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.Operation of oil immersed transformerDonggongon,kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, drilling stop hole is a good way to remove in-situ stress and prevent widening.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation,VannLightning protection of distribution transformer, and overload is not allowed in the whole process of operation.


VannTransformer inductorBecome the industry



The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω The resistor is generally more than & omega;, According to Ohm's law, the current is only / of the total current flow, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.If the volume of power transformer is too small the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Interpretation and observation,The whole process of hanging the core of dry-type transformer is more critical,Vann2000 KVA dry type transformer, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.


VannTransformer inductorBecome the industry



The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Quality inspection report,The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.When the operating oil is mixed with different types of new oil or used for oil,VannUnit price of scb11 dry type transformer, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).Vann,After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.The method and whole process of taking oil sample of power transformer are as follows:

5 Replies   |  until 2023-03-25 22:43:46 | 258 Views

Yongbao Information Technology Co., Ltd. 2023-03-25 23:15:08 support  0 | be opposed to  0

Follow you VannTransformer inductor for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected. The boss praised it.

Provide conference reception services 2023-03-25 23:47:06 support  0 | be opposed to  0

I have almost never seriously evaluated it before. I bought yours VannTransformer inductor and will visit it next time. It is so convenient that I can’t stop at all. It’s a genuine product with fast logistics. I like it for you.

dust collector 2023-03-26 07:00:41 support  0 | be opposed to  0

Haha, I like it very much, like and cheer for the boss VannTransformer inductor

Tourism project development 2023-03-25 23:06:30 support  0 | be opposed to  0

I’ve been too busy lately, the confirmation is late, the quality is good, VannTransformer inductor genuine, good quality and cheap, haha.

Reactive powder concrete 2023-03-26 07:00:05 support  0 | be opposed to  0

Very good buyer. Thank you. My colleagues like it very much VannTransformer inductor. Come again next time
Log inContent can only be published later