MarseilleHow much is the installation cost of small cold storageUser manual

632HP195506591   ·  2024-03-27 01:15:27   ·   energy

Cold storage is fireproof, flame retardant and high resistance. Professional cold storage installation, cold storage installation, cold storage construction fruit preservation cold storage, medical cold storage and other special products, old brands, price advantages and guaranteed quality. Polyurethane is a flame retardant self extinguishing material after adding flame retardant. Its softening point can be above degrees Celsius and will only be decomposed at higher temperatures. In addition the ash formed on the surface of polyurethane will be in its foam, and this ash will help isolate the foam below. It can effectively prevent the spread of fire. Moreover, polyurethane will not produce harmful gas at high temperature.According to the size and nature of the cold storage area and in combination with local regulations, the construction form of food cold storage warehouse is to determine the plane layout based on the site, whether it is a single-layer or double-layer warehouse, refrigeration, product stacking, etc. are used to determine the size and location of the cold storage room, so that it can become a whole.Marseille,Expensive, not in high-pressure occasions; Due to large fuel injection and complex oil treatment system, the quick-frozen warehouse increases the regulation of gas composition, inhibits the respiration of fruits and vegetables, delays their metabolic process, better maintains the freshness and commercial quality of fruits and vegetables, and prolongs the storage period and shelf life of fruits and vegetables. Generally, controlled atmosphere storage of fruits can prolong the storage period by & mdash; Three times or more. OK, what is the standard of quick freezing warehouse?MatagalpaWhen the cold storage is built, the diffusion of water vapor and the infiltration of air shall be prevented. When outdoor air invades, it will not only increase the cold consumption of the cold storage, but also bring moisture into the warehouse. Moisture condensation will damp the heat insulation structure and freeze and damage the cold storage structure. Therefore, it is necessary to set moisture-proof and heat insulation layer, professional cold storage installation installation of cold storage, cold storage construction, fruit fresh-keeping cold storage, medical cold storage and other products, which have a complete variety, sell well at home and abroad, and have a long service life! Products lead the wire industry. Welcome to inquire, so that the cold storage building has good sealing,MarseilleWhich is a good place to install a small cold storage, moisture-proof and steam isolation performance.The evaporator surface is too thick or too much dust, and the heat transfer effect decreases: another important reason is that the heat transfer efficiency of evaporator is low, which is mainly caused by excessive frost or excessive dust on the evaporator surface.Whether the water pump works normally and whether the moldy switch is effective. In case of abnormality, timely handle the overhaul and maintenance of the refrigeration compressor in the cold storage: generally, the refrigeration oil and drying filter shall be replaced times after the operation of the cold storage equipment. Replacement after half a year. Depending on the circumstances.


MarseilleHow much is the installation cost of small cold storageUser manual



The three-dimensional automatic cold storage adopts a computer, which can complete the loading, unloading and stacking in the storage, the control of storage temperature and the operation of refrigeration equipment.Ammonia filling leak test: ammonia filling leak detection can be carried out after system blowdown and pressure leak test. The purpose is to improve the air tightness of the fresh-keeping warehouse system and lay a good foundation for the system to fill ammonia and wrap thermal insulation materials.General quick-frozen warehouses are mostly cooled by refrigeration mechanism with low gasification temperature (ammonia or Freon)Superior quality,Fault phenomenon: high current or tripping during unit startup, and problems of user air switch; Input voltage is too low; The star angle conversion interval is too short (it should be ~ seconds); Hydraulic cylinder failure (no reset); Intake valve failure (too large opening or stuck); Loose wiring; Host failure; Main motor fault; TR time relay is broken (relay unit).Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation, water and electricity systems. It should meet the requirements of safety, science and environmental protection. When designing and installing the cold storage, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.Polystyrene foam: polystyrene foam is a new type of synthetic thermal insulation material. It is a kind of plastic, with small density, light weight, strong heat insulation effect and excellent low temperature resistance. However, due to its cold shrinkage, it is not very convenient for installation.


MarseilleHow much is the installation cost of small cold storageUser manual



During the installation of long-span top warehouse plate, if the supporting steel beam has been installed in the warehouse, the top warehouse plate and the supporting steel beam shall be fixed with pull rivets during the installation of each warehouse plate, and each top warehouse plate shall be riveted in two rows; If the lifting point type is adopted, the installation and construction of the lifting layout shall be realized before the installation and construction of the top silo plate, so as to ensure that each lifting point can be installed at the same time during the installation of the top silo plate; The lifting point shall ensure that there are at least two points along the width direction of each warehouse plate.offer,Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling, load-bearing, antifreeze, moisture-proof, etc.For the selection and preparation of the ground location of the cold storage, the design of the cold storage shall consider the necessary auxiliary engineering buildings and equipment,MarseillePharmaceutical warehouse management system, such as working intermediates, packaging and combing room, special tool warehouse,MarseilleCold storage professional installation company, loading and unloading platform, etc. - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance, and make U-bend and silica gel outside the storage.Marseille,Reasonable space: the power consumption of the cold storage is calculated according to the cold consumption of the cold storage which usually includes two parts: the cold consumption during cargo cooling and refrigeration; It is the cooling consumption of the refrigeration room itself and operation management.Initial stage of cold storage equipmentInstallation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse, the distance between the box bottom and the top of the warehouse must be & amp; gt; mm; The electrical box can be fixed on the building wall or on the angle steel frame.

0 Replies   |  until 2024-03-27 01:15:27 | 13 Views
Log inContent can only be published later