RimuskyGrouting pipeThe price remained stable and relatively cold

263HP145816628   ·  2022-04-18 09:07:56   ·   Electronic Component

● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

RimuskyGrouting pipeThe price remained stable and relatively cold


The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious thin mud slurry can also be used as circulating fluid.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious,RimuskySeamless pipe, thin mud slurry can also be used as circulating fluid.RimuskyGrouting pipeThe price remained stable and relatively cold,2022-04-1809:10:15The grouting mechanism includes filling grouting, infiltration grouting, and chemical slurry includes silicate (water glass) and high slurry. Silicification method alkali solution method, double liquid silicification method high chemical grouting method and cement grouting method.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, aerated silicification method and electric double liquid silicification method.

RimuskyGrouting pipeThe price remained stable and relatively cold


● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Rimusky,Taourirt,It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint,RimuskyPrecision tube, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe,RimuskyGrouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

4 Replies   |  until 2022-04-18 09:07:56 | 197 Views

Agricultural vehicle drive shaft 2022-04-18 09:51:34 support  0 | be opposed to  0

I bought a lot of you RimuskyGrouting pipe and I am very satisfied. Very good seller, I will come often.

Steel machine well room 2022-04-18 09:11:57 support  0 | be opposed to  0

I want to change a supplier and see you on the Internet, can I give a detailed explanation RimuskyGrouting pipe

cleaning 2022-04-18 09:25:02 support  0 | be opposed to  0

Old acquaintances, things are as good as always, genuine RimuskyGrouting pipe, outstanding cost performance

FRP product sales 2022-04-18 10:02:07 support  0 | be opposed to  0

It's rare to buy RimuskyGrouting pipe, I saw such a good store. The price is very favorable, the service is also very good, and the things are good. Give me a good encouragement this time.
Log inContent can only be published later