Judy bonicoOil immersed transformer monitoringThere are many things to pay attention to in the selection of materials

122HP117294921   ·  2022-05-11 00:55:34   ·   Machinery and industry equipment

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Judy bonico,The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, so as to further improve the stability of the temperature maintenance system software.Careless maintenance and insulation damagePlumbon,kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.What is the important role of power transformerIf the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption,Judy bonicoModel and meaning of oil immersed transformer, the load can be connected.The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time,Judy bonicoBox type transformer door, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Free consultation, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover,Judy bonico400 KVA price of box type transformer, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.Brief introduction of zero line of power transformer


Judy bonicoOil immersed transformer monitoringThere are many things to pay attention to in the selection of materials



Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).Excellent quality,In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Judy bonico,During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Manufacturing process and steps of dry-type transformerThe project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

3 Replies   |  until 2022-05-11 00:55:34 | 262 Views

Production and sales of dust removal equipment accessories 2022-05-11 10:19:43 support  0 | be opposed to  0

Cooperation with you is really good, Judy bonicoOil immersed transformer monitoring good quality, come to our company again if you have time.

FRP products 2022-05-11 08:53:44 support  0 | be opposed to  0

The first online purchase Judy bonicoOil immersed transformer monitoring. I use my personal experience to tell everyone that your service attitude is very good. The quality of the goods is also very good. I like you!

plastic mountain 2022-05-11 08:39:56 support  0 | be opposed to  0

Judy bonicoOil immersed transformer monitoring I received it, the seller delivered the goods very quickly, the logistics is also very good, the customer service attitude is excellent, very patient, giving people a kind of intimacy, and I really like it. There are also exquisite packaging and high-end atmosphere. It can be seen that the merchants are very careful. Judy bonicoOil immersed transformer monitoring It's really good, it matches the picture, there is no difference, it is really good value for money.
Log inContent can only be published later