BramptonInstallation of cold storage worksSolutions to compression challenges

632HP195506591   ·  2022-04-29 06:03:24   ·   energy

The butt joint between the top warehouse plate and the end of the top warehouse plate shall be treated to prevent air leakage and cold running. After all the top warehouse plates are installed, the butt joint shall be filled with foaming material, and the mm wide color steel plate shall be sealed at the butt joint with pull riveting.Commissioning cold storage. After all parts of the cold storage are installed and connected, the cold storage can be started for cold storage commissioning. According to the needs of customers, adjust the value of the cold storage, the cold storage can reach the predetermined temperature, the cooling speed and the operation of the cold storage are normal, and the cold storage can be delivered for use. The cold storage installation unit shall also provide the cold storage user with training on cold storage use and management knowledge, as well as some after-sales training.Brampton,Vibration shall be prevented during the whole operation of the refrigeration unit. In addition to the abrasion of the lifting mechanical equipment, vibration will continue to cause loosening or cracking of the upper connecting pipe of the generator unit. If abnormal noise is found during the whole operation of the equipment, it shall be shut down for inspection before operation. The maintenance functions of the refrigeration unit have been set and do not need to be adjusted.Compression refrigerator is commonly used, which is mainly composed of compressor, condenser, throttle valve and evaporation pipe. According to the way of evaporation pipe device, it can be divided into direct cooling and indirect cooling. Direct cooling the evaporation pipe is installed in the refrigerated warehouse. When the liquid coolant passes through the evaporation pipe, it will directly absorb the heat in the warehouse and cool down.Caribbean,The installation of top warehouse plate should be carried out alternately with the installation of wall plate and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate, the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be mm; According to the design drawings, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, support steel frame, etc. and the welded junction shall be moisture-proof and treated according to the drawing requirements.Judge the operating sound of the compressor, and carefully listen to the operating sound of water pump, cooling tower, fan and other equipment. In case of abnormal sound, timely warranty is required, so as to avoid greater damage to the compressor due to untimely warranty.The type of cold storage to be built in the type of cold storage should be determined according to the type of circulating goods. For example, the cold storage that only circulates vegetables can only build a fresh-keeping cold storage, while the cold storage with refrigeration + freezing will be built if there are many types of circulating goods and great difference in storage temperature. As for the size of the cold storage, it should be determined according to the type quantity, frequency, cycle, whether to use shelf stacking and so on. For example, for fruits and vegetables packed in cartons, the storage capacity of -kg per cubic meter can be referred to, and the size of cold storage construction can be estimated in combination with the storage capacity rate of about .-..


BramptonInstallation of cold storage worksSolutions to compression challenges



Danfoss thermal valve is adopted for the thermal valve of the cold storage, with guaranteed quality; Due to the high temperature requirements of the cold storage and the high degree of automation and regulation of the temperature, the temperature system of the cold storage adopts microcomputer full-automatic, does not need special people to operate and can be remotely controlled. When the temperature exceeds the specified range, it will automatically alarm, which is of great significance to the proper preservation of the cold storage.Fix the wires of electrical components with binding wires.Judge the operating sound of the compressor, and carefully listen to the operating sound of water pump, cooling tower, compressor, fan and other equipment. In case of abnormal sound, timely warranty is required, so as to avoid greater damage to the compressor due to untimely warranty.Test conclusion,Some cold bridge prevention measures shall be taken at the joints between polyurethane insulation boards.The refrigerant charge is insufficient. At this time, just add enough refrigerant.Immediate cooling is to install the condenser of the cold storage in the box or building of the cooling equipment, use the volatilization of the refrigerant to immediately cool the air in the air, and use the cold air to cool the objects that need to be cooled. This kind of refrigeration is characterized by faster cooling speed, small heat conduction temperature difference and simple system software, so it is widely used.


BramptonInstallation of cold storage worksSolutions to compression challenges



The foundation of cold storage is affected by low temperature,BramptonHow much does it cost to install a cold storage, and the water in the soil is easy to be frozen. Due to the volume of frozen soil, the ground will be broken and the whole building structure will be deformed. If the damage is serious, the floor of low-temperature cold storage must be treated under the thermal insulation layer to prevent soil freezing. The bottom plate of the cold storage shall stack a large number of goods and pass through various loading in addition to the thermal insulation layer, unloading and transportation machinery and equipment. Therefore, the structure of the cold storage plate shall be firm and have large bearing capacity. In low temperature environment, especially in the process of periodic freezing and thawing cycle, building structures are vulnerable to. Therefore, the structure of each part of the cold storage and the building materials of the cold storage should have sufficient frost resistance.Design brand,Initial stage of cold storage equipmentAs an important support for the development of cold chain performance, the standardized construction of cold storage refrigeration system is very important. It not only helps to rationalize the energy consumption of the cold storage system, but also has an important impact on improving the low-temperature preservation quality of commodities.Install the electric control system. The electric control system of the cold storage mainly includes electric controller, electric door, lighting and other electrical equipment in the cold storage. The power supply of the cold storage is required to be stable phase line, and the power supply or backup power supply can be used as required. The circuit shall have reasonable discharge and corresponding protective measures.Brampton,BramptonHow much is the installation of cold storage per square meter,The refrigeration equipment in the fresh-keeping environment of the quick-frozen warehouse mostly adopts the single-stage compression refrigeration system, with freon as the refrigerant. The evaporation mode in the warehouse is the cooling fan, which can be ceiling type. If the number of warehouses is small and the volume does not exceed cubic meters, the mode of multiple heads in parallel can be considered.When hot ammonia defrosting or electric defrosting is selected as the cooling fan, professional cold storage installation, cold storage installation, cold storage construction, fruit preservation cold storage, safety, environmental protection and economy! The products are exported to foreign countries and are deeply trusted. Defrosting and drainage can be discharged immediately. Electric heat tracing and insulation can be selected for the defrosting and drainage pipeline of the warehouse location.Requirements for the cold storage time of the device: the cold storage of the refrigeration system using ammonia as refrigerant shall be supported in the place with low population density around.

5 Replies   |  until 2022-04-29 06:03:24 | 225 Views

Cool Software Technology Company 2022-04-29 13:51:20 support  0 | be opposed to  0

Your service is very good, BramptonInstallation of cold storage works is also very cheap! I will come often in the future!

Youchuang Future Technology and Trade Co., Ltd. 2022-04-29 08:06:30 support  0 | be opposed to  0

BramptonInstallation of cold storage works Give me a discount next time, I wish you a lot of money

yaka trading co. 2022-04-29 08:07:26 support  0 | be opposed to  0

A good seller, even a novice, a lot of BramptonInstallation of cold storage works don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of accomplishment, and finally figured out the problem that I didn’t understand.^- ^Learn more in the future!

Jintong Co., Ltd. 2022-04-29 13:24:27 support  0 | be opposed to  0

The boss is so kind, he really knows his job well. Under your guidance, I will soon become an expert! The seller's service is really attentive. Bring colleagues together in the future. Very good BramptonInstallation of cold storage works. Thank you.

Repair of ancient buildings 2022-04-29 13:35:00 support  0 | be opposed to  0

You BramptonInstallation of cold storage works are good, is it convenient to place an order?
Log inContent can only be published later