NaranjoAdvance small conduit for tunnelDevelopment trend of

965HP113924865   ·  2023-03-22 01:08:00   ·   Building materials

The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound,NaranjoAdvance support of small conduit, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation. The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.Naranjo,(the density of steel pipe is kg/dm calculation formula: w = . (D-S) s where: W - theoretical weight of steel pipe per meter, kg / M; D - Nominal outer diameter of steel pipe, mm; S - nominal wall thickness of steel pipe, mm. It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.Bellatserkva,In recent years, there have been frequent natural disasters, such as mountain slides, floods, earthquakes, fires etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, the subgrade will not be greatly damaged due to natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe which is made of mesh base material through internationally advanced warp knitting process and surface coating treatment. It has high tensile strength and low elongation in both longitude and latitude, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement, railway subgrade, embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles, or manually.In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.Causes of wrinkling: the blanking specification of pipe joint is too long.


NaranjoAdvance small conduit for tunnelDevelopment trend of



The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, but because it is limited by casing and other accessories,NaranjoSelf drilling hollow anchor manufacturer, it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular, lateral and combined displacement of the pipe due to thermal deformation, pressure resistance, temperature resistance, corrosion resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.[] it should be noted that the above specific embodiments are only exemplary. Under the above teachings of the utility model,NaranjoExpanded shell hollow grouting anchor manufacturer, those skilled in the art can make various improvements and modifications on the basis of the above embodiments, and these improvements or modifications fall within the protection scope of the utility model. Those skilled in the art should understand that the above specific description is only for the purpose of explaining the utility model, and is not intended to limit the utility model. The scope of protection of the utility model is defined by the claims and their equivalents. Classification of grouting pipe grouting pipe the grouting pipe is a plane mesh material of grouting pipe with certain flexibility. The main raw material is polyethylene grouting pipe. It is extruded into thin sheets by a grouting pipe extruder, and then punched with regular holes. Then it is made by directional stretching under the control of heating. It can be divided into unidirectional grouting pipe and bidirectional grouting pipe according to the different stretching modes when it is manufactured.Potential development,The use of grouting pipes has become indispensable in modern building construction, ranging from super high-rise and high-rise buildings to multi-storey buildings and indoor decoration construction. China has a longer history of using grouting pipes. Many of China&#;s ancient buildings have been listed as world-class material and cultural heritage because China&#;s ancient buildings are very technical in construction. In China, before and in the early s grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw, pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible. performance of grouting pipe the grouting pipe is light in weight, has strong bite force with soil or gravel, is acid-base resistant, corrosion-resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, poor mechanical damage resistance, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?


NaranjoAdvance small conduit for tunnelDevelopment trend of



The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.Process inspection,The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.[] a fast cutting device in the hole of a underground grouting pipe, the fast cutting device in the hole mainly consists of a fixed cutting device (as shown in Fig. , a tension blade device and a cutting rotating device [] the tension blade device is sleeved in the cutting rotating device , and screw threads are respectively set on the outer surface of the cutting rotating device and the upper end of the tension blade device , The tension blade device and the cutting rotating device are connected by threads. The end of the tension blade device protruding from the cutting rotating device is provided with a tension blade nut , as shown in Fig. It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaNaranjo,The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.How heavy is a grouting pipe?When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?


4 Replies   |  until 2023-03-22 01:08:00 | 203 Views

computer software 2023-03-22 09:11:18 support  0 | be opposed to  0

So give praise! Just received the goods, very good, NaranjoAdvance small conduit for tunnel great value for money! ! Come in the future!

Sales of smoke extraction systems 2023-03-22 08:12:24 support  0 | be opposed to  0

When NaranjoAdvance small conduit for tunnel offer discount points for activities, contact me when there are discounts

dust collector 2023-03-22 09:19:42 support  0 | be opposed to  0

The manager is nice! NaranjoAdvance small conduit for tunnel is also real.

New material technology research and development 2023-03-22 09:17:57 support  0 | be opposed to  0

NaranjoAdvance small conduit for tunnelHow much is it, can I transfer the goods?
Log inContent can only be published later