At the same time, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface,KosinburgLeading small conduit manufacturer, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.Kosinburg, The distance between measurement points is cm, and when abnormalities are found, it is encrypted to cm.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.BogoPlastic pipe plastic pipe has a low acoustic impedance, which is used as a grouting pipe and has a large acoustic transmission rate. It can usually be used for smaller cast-in-place piles. It should be cautious when used in large-scale cast-in-place piles - because large-diameter piles need to be poured with a large amount of concrete, and the hydration heat of cement is not easy to dissipate. In view of the great difference between the thermal expansion coefficient of plastic and concrete, the plastic pipe will shrink radially and longitudinally due to the temperature drop after concrete solidification, It may be separated from the concrete locally to cause air or water crevices, and add more strong reflection interfaces on the sound path, which is easy to cause misjudgment.When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, so as to give play to the anti reflection crack performance of the glass fiber grouting pipe. It can also ensure the shear resistance and adhesive force of the adhesive layer of the glass fiber grouting pipe.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation,KosinburgGrouting pipe, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?


KosinburgAdvance small conduit tunnelOriginal stock



Before the installation of the grouting pipe it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it. The concrete shall be evenly distributed, and the vibration shall be 'fast inserting and slow pulling' and slightly pumped up and down to make the concrete vibrate evenly. The vibration shall be carried out in sequence to avoid over vibration and missing vibration until the concrete surface is horizontal, no significant subsidence, no bubbles and no mortar on the surface. During vibration, the vibrating handle shall not touch the side formwork, grouting pipe, pipeline, embedded parts, etc.The use of grouting pipes has become indispensable in modern building construction, ranging from super high-rise and high-rise buildings to multi-storey buildings and indoor decoration construction. China has a longer history of using grouting pipes. Many of China&#;s ancient buildings have been listed as world-class material and cultural heritage, because China&#;s ancient buildings are very technical in construction. In China, before and in the early s, grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible.demand, The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head and the size matches the flange of the Christmas tree wellhead.The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.


KosinburgAdvance small conduit tunnelOriginal stock



A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe,KosinburgAdvance support small conduit, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.Potential development, it can be protected. The piston rod can be protected by adding plastic hoses or bellows within the travel range.[] a flange I and a bearing are provided on the outer surface of the cutting rotating device The fast cutting device in the hole is installed in the grouting pipe hole through the flange. The fixed cutting device is mainly composed of a cutting blade and a pulley. The expansion and contraction diameter of the blade is adjusted by the bolts at the tail of the rotating flange to cut the grouting pipe. The rotating blade and the pulley are connected to the rotating device through slots.[] the outer diameter of the cutting rotary device is mm smaller than the inner diameter of the grouting pipe, so that the device can smoothly extend into the grouting pipe for cutting.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaKosinburg, Grouting pipe at tensioning end: the grouting pipe installed at the end of the grouting pipe reinforcement and capable of tensioning is also called grouting pipe grouting pipe. The so-called grouting pipe is a grouting pipe in post tensioning structure or component to maintain the tension of the grouting pipe reinforcement and transmit it to the mixed tension; Fixed end grouting pipe: a grouting pipe installed at the end of the grouting pipe reinforcement and usually buried in the concrete without tensioning. The standard of the grouting pipe used for the grouting pipe reinforcement is the national standard of the people&#;s Republic of China (GB / T -, which ensures that the products manufactured by our company conform to the product quality law of the people&#;s Republic of China and the standard law of the people&#;s Republic of China Grouting pipe is the only acoustic pipe specially used for ultrasonic testing in the market. The grouting pipe is made of cold and hard steel pipe after professional molding, and is connected by clamp pressure connection, screw connection, flange connection and other methods. It has a reliable anti-seepage effect during concrete pouring. Two convex grooves are planned at the end of the bell end of the high-strength double seal clamp type acoustic measuring pipe, and the convex grooves are equipped with sealing rings. When installing the device, the socket end of the product is stabbed into the bell end by cm, and then the two convex grooves are kneaded together with special hydraulic pliers. The pipe at the kneaded part is shortened and deformed after being stressed, and the outer pipe between the two convex grooves is deeply immersed into the inner pipe, and then the reliable connection of the product is completed; After being kneaded, the rubber sealing ring deforms and fits between the two layers of pipes, playing an excellent double safety sealing effect. The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation. Low cost, fast time, free from climate and place constraints.


0 Replies   |  until 2024-03-26 01:22:12 | 40 Views
Log inContent can only be published later