CologneMobile boarding bridgeInternational Color Research Institute

275HP127226562   ·  2024-06-25 01:01:56   ·   Machinery and industry equipment

What are the functions of anti rust primer for warehouse cargo elevators?The surface of each part of the brush should be kept clean, and the brush pressure should be adjusted to ensure that its area is not less than %.Cologne,However, large welded structural components have the characteristics of complex morphology, large weight large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, it is crucial to develop a reasonable process. Therefore, they found Nanjing Juhang and our JH- vibration aging equipment,CologneCar mounted scissor fork lifting platform, and requested us to develop a complete vibration aging process.The wear rate is fast, and due to factors such as processing, assembly, and adjustment of new machine components, the friction surface is rough, the mating surface area is small, and the surface pressure condition is uneven. During the operation of the machine, in turn, further accelerating the wear of the mating surface of the parts. Therefore,CologneTraction lifting platform, during the running-in period, it is easy to cause wear on components (especially the mating surface) with a fast wear rate. At this point, if overloaded, it may cause damage to the components and lead to early failures.Naranjal,Regularly check the connection of each part and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure (the rotating arm can be used to cause compression)  ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities, it shall order the immediate elimination of potential safety hazards in the production of construction elevators and cargo elevators discovered during the inspection. If safety cannot be guaranteed before or during the elimination of major production safety hazards, it shall be ordered to evacuate workers from the hazardous area or temporarily stop construction. In the work of hazard investigation and control, the investigation shall be serious the rectification shall be resolute, and the results shall be consolidated.Check if the usage period of the speed limiter has expired. If it exceeds the usage period, it is necessary to send it to a qualified professional unit for inspection and calibration. What are the functions of the lifting stage device?


CologneMobile boarding bridgeInternational Color Research Institute



Check and clean the driving gears and guide wheels of the elevator. If there is excessive wear, it is necessary to replace themLow failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends it is driven by the pressure generated by its own weight, which greatly saves energy.Every customer pays attention to the price of elevators, so how does the manufacturer calculate the price of elevators? In general, the manufacturer calculates the price of the elevator for customers based on the actual size, height, and carrying capacity of the on-site reserved opening provided by the customer Customers do not need to pay too much attention to the price difference between different elevator manufacturers when purchasing elevators, as the different materials used, material brands, and production processes result in different prices for elevators Customers can consider the cost-effectiveness of elevators more when purchasing, with the principle of getting what they pay for. Safety hazard elimination plan for lifting cargo elevators: When there is a malfunction or abnormal situation in the lifting cargo elevator, it should be immediately stopped from use. After eliminating the malfunction and accident hazards, it can be put back into useInstallation requirements,Regularly check all wires and cables for damage. Timely bandage and replace damaged parts.Regularly check all wires and cables for damage. Timely bandage and replace damaged parts.The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm,CologneCar mounted aluminum alloy lifting platform, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area,Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracketThe lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.Check the safety interlocking equipment of the first cut door of the hanging cageCologne,Monthly maintenance: View weekly inspection itemsCheck the relative orientation between the cable support wall and the cable guide frameRegularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.


2 Reply   |  Until 2024-06-25 01:01:56 | 51 View

computer software 2024-06-25 08:43:39 Support  0 | Against  0

Although CologneMobile boarding bridge has not yet arrived, I am looking forward to it, and the inquiry is still in transit.

Transmission and distribution steel pole 2024-06-25 09:20:02 Support  0 | Against  0

It is still affordable to buy things online, CologneMobile boarding bridge I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is also very fast.
LoginCan Publish Content