Pidras nigrasS13-50 / 10 power transformerEnterprise's profit demand

122HP117294921   ·  2022-12-04 02:47:47   ·   Machinery and industry equipment
including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.In the electric field of the winding to the yoke

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible,When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.The key reason for oil leakage is that there are defects in cast iron partsJagwald,In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance,Pidras nigrasOil immersed transformer temperature controller, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.


Pidras nigrasS13-50 / 10 power transformerEnterprise



Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire,Pidras nigrasDry type transformer applications, please be rational to make the oil immersed transformer safer and more efficient.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, which is resistant to corrosion and rust, and has sound insulation and noise reduction.Quality Assurance,Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.Falling foreign matters and piercing


Pidras nigrasS13-50 / 10 power transformerEnterprise



During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Inspection requirements,The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.In order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.Noise solution of dry-type transformerPidras nigras,() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.When the transformer is put into operation, if the tap changer is not in time a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

3 Replies   |  until 2022-12-04 02:47:47 | 172 Views

Special wrench 2022-12-04 10:58:43 support  0 | be opposed to  0

Cooperation with you is really good, Pidras nigrasS13-50 / 10 power transformer good quality, come to our company again if you have time.

Tablet The company's own products 2022-12-04 10:11:36 support  0 | be opposed to  0

After so many years of online shopping, this is the first time I have taken this seriously. I was holding my phone and staring at the screen with a sense of anxiety, and I dared not start. In order to write a notarized evaluation of Pidras nigrasS13-50 / 10 power transformer, send four characters, high quality and low price. This is my happy online shopping, thank you!

Technology research and development of network engineering technology and products 2022-12-04 10:35:34 support  0 | be opposed to  0

After looking for the Pidras nigrasS13-50 / 10 power transformer from your family for a long time, I mustered up the courage and the quality of the inspection was very good.
Log inContent can only be published later