Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, service, stop leakage, strengthen and correct the deflection of buildings.Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe,Big NovaGrouting pipe,Big NovaSeamless pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.
A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it is used to install orifice closure device to prevent slurry leakage.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.Big NovaGrouting pipeA new round of rise is expected in the middle and late part of the year,2024-03-2504:37:19The secondary grouting pipe can only be grouted once and cannot be reused.Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe,Big NovaSteel pipe, grouting pipe factory, high price, service on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe, advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities new and old customers are welcome to consult to determine the grouting pressure and flow,Mushie and determine the grouting slurry and its initial concentration.Big Nova,● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
yanqiang wire mesh co., ltd. 2024-03-25 12:51:47 support 0 | be opposed to 0
Shield machine accessories sales 2024-03-25 12:12:24 support 0 | be opposed to 0
Machine tool accessories 2024-03-25 13:32:05 support 0 | be opposed to 0
Wholesale of cultural office supplies 2024-03-25 11:47:49 support 0 | be opposed to 0
Repair of electronic equipment 2024-03-25 12:07:43 support 0 | be opposed to 0