Power transformer factoryCaused by sand holes and cracks. For crack leakage drilling stop hole is a good way to remove in-situ stress and prevent widening.Tarachin,The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.Funtua,What is the reason for the shutdown of power transformer?Causes of fire in power transformerFault judgment of power transformer
The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Where to sell API,The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, Y & rdquo;,TarachinHigh voltage distribution transformer, & ldquo; y, D & rdquo; and & ldquo; D D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn wiring group when UAB and UAB overlap, the minute hand points to . & ldquo; & rdquo; in the new wiring group,TarachinParameters of oil immersed transformer, it is indicated by & ldquo; & rdquo.The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column,TarachinProtection of oil immersed transformer, but there are many calculation methods.After hours of continuous trial operation with a certain load, and the transformer will turn to all normal operation.
When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.demand,Oil leakage of heat pipe radiatorThe efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, the human resources traction belt shall be used as a guide.Tarachin,For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.Careless maintenance and insulation damage
Kitchen accessories 2022-11-15 09:00:48 support 0 | be opposed to 0
Machine tool processing retail 2022-11-15 08:49:23 support 0 | be opposed to 0
Special wrench 2022-11-15 09:25:10 support 0 | be opposed to 0
network 2022-11-15 10:10:02 support 0 | be opposed to 0