SotkamoHow much is the professional design and installation of cold storageMatters related to the use of

632HP195506591   ·  2024-03-26 01:24:48   ·   energy

Thermal insulation performance of thermal insulation materials for food cold storage the requirement of polyurethane thermal insulation materials for cold storage is thermal insulation performance, strict material selection is carried out in order to achieve this goal: using structural amine ether to reduce thermal conductivity and improve thermal insulation effect; Reduce the water content of various raw materials and formulas as much as possible to avoid deterioration of thermal insulation performance caused by water foaming; Polyether: the product of a large processed factory after strict postprocessing is compared with the polyether of small factory without postprocessing. The foam cell has high uniformity of foam pores and thin wall of foam holes, and its heat preservation performance is obviously better than that of ordinary foam with thick wall and big hole. The use of the tasteless amine catalyst can effectively adjust the balance between foaming and gel reaction so that the interlayer skin of the sprayed coating is thinner, which is beneficial to the performance of the thermal insulation material of the cold storage. Ordinary polyester polyols are not used.Different food processing technical processes for the construction of cold storage are combined with local urban planning. The construction of cold storage is the design requirements and construction of cold storage, which not only avoids the cross pollution between foods, but also ensures its transportation facilities: within the construction scope, a reasonable overall layout saves land and reduces costs.Sotkamo,Refrigerated vehicle planning Kende refrigeration reminds enterprises with the construction needs of logistics refrigerated warehouse project to conduct in-depth communication with the project and refrigerated vehicle planning on warehouse location and actual use needs when determining the final installation construction mode, so as to ensure the smooth circulation of goods in logistics refrigerated warehouse.During the installation of polystyrene storehouse, the Perpendicularity Error of wall plate shall be corrected while the top storehouse plate is installed. The length of the top warehouse plate shall be mm shorter than the surface of the wall plate. After the installation of the top warehouse plate the mm gap shall be marked with foaming material to ensure the sealing performance of the warehouse body.Farah, and the water in the soil is easy to be frozen. Due to the volume of frozen soil, the ground will be broken and the whole building structure will be deformed. If the damage is serious, it may even make the cold storage unusable. Therefore, in addition to the thermal insulation layer, the floor of low-temperature cold storage must be treated under the thermal insulation layer to prevent soil freezing. The bottom plate of the cold storage shall stack a large number of goods and pass through various loading,SotkamoLarge and medium-sized cold storage installation company, unloading and transportation machinery and equipment. Therefore, the structure of the cold storage plate shall be firm and have large bearing capacity. In low temperature environment, especially in the process of periodic freezing and thawing cycle, building structures are vulnerable to. Therefore, the structure of each part of the cold storage and the building materials of the cold storage should have sufficient frost resistance.Commissioning cold storage. After all parts of the cold storage are installed and connected, the cold storage can be started for cold storage commissioning. According to the needs of customers adjust the value of the cold storage, the cold storage can reach the predetermined temperature, the cooling speed and the operation of the cold storage are normal, and the cold storage can be delivered for use. The cold storage installation unit shall also provide the cold storage user with training on cold storage use and management knowledge, as well as some after-sales training.


SotkamoHow much is the professional design and installation of cold storageMatters related to the use of



The water tank is designed to be separated from the machine body and is double-layer. It will not drip due to condensation caused by internal and external temperature difference. It can be interlocked with the refrigeration system, that is, it will not be humidified during refrigeration to prevent serious frosting of the fan.After years of service, the refrigeration oil inside the compressor should be replaced. The oil, copper, iron and impurities caused by wear are mixed in the refrigeration system, which thickens the refrigeration oil, deteriorates the fluidity and performance, reduces the effect, takes a long time, increases the burden on the compressor, and the current will increase relatively compared with the new machine,SotkamoInstallation price of 30 M2 cold storage, which is a bad phenomenon.When the cold storage is built, the diffusion of water vapor and the infiltration of air shall be prevented. When outdoor air invades, it will not only increase the cold consumption of the cold storage, but also bring moisture into the warehouse. Moisture condensation will damp the heat insulation structure and freeze and damage the cold storage structure. Therefore, it is necessary to set moisture-proof and heat insulation layer, professional cold storage installation, installation of cold storage cold storage construction, fruit fresh-keeping cold storage, medical cold storage and other products, which have a complete variety, sell well at home and abroad, and have a long service life! Products lead the wire industry. Welcome to inquire, so that the cold storage building has good sealing,The installation of top warehouse plate should be carried out alternately with the installation of wall plate, and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate, the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be mm; According to the design drawings, if there are supporting beams columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column, support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body, good waterproof performance, fire and high temperature resistance, strong overload capacity, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with . color plate angle steel; When installing each wall panel, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, and the rivet spacing in the warehouse should be mm; When connecting the library plate in the form of eccentric hook connection, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.Cold storage construction: which one is suitable for you? Which one is suitable for you?


SotkamoHow much is the professional design and installation of cold storageMatters related to the use of



Large space rate of quick-frozen warehouse: for quick-frozen warehouses of the same size, reasonable design schemes store more goods than unreasonable ones. For the fixed size quick freezing warehouse, how to design it to maximize its space rate is often an important problem considered by our designers. In the design scheme of Lukang medical quick-frozen warehouse, we reasonably designed to expand the original storage capacity of boxes to boxes, which increases the space a lot.Industry management,For the flushing (thawing) drainage pipe in the cold room with different temperature, an exhaust valve equipment shall be set before connecting the flushing (thawing) drainage pipe.The function of refrigeration is & amp; amp; ldquo; Low temperature storage & amp; amp; rdquo; Introduction & amp; amp; ldquo; Loop type & amp; amp; ldquo; Cold chain logistics & amp; amp; rdquo;During the use of cold storage, attention shall be paid to the collision and scratch of the storage body to avoid the depression and corrosion of the storage plate, which will seriously reduce the local thermal insulation performance of the storage body.Sotkamo,SotkamoInstallation diagram of cold storage sliding door, ventilating medical products may also emit some odors. Once these odors are stored in a certain quantity, they will also have a certain impact on other products. Therefore, we must carry out regular ventilation in the process of daily use, so as to effectively reduce the storage time of products. If the medical cold storage project uses row tube refrigeration, the image of frosting may appear after use for a period of time. If we do not defrost in time, it will also affect the effect of. Therefore, I hope you must pay attention to defrosting.Emergency measures during the use of the medical cold storage project, it may also encounter power failure or power failure. In fact, most medical cold storage projects will be equipped with emergency equipment, so that the medical cold storage project can achieve the effect of normal power supply. Once the automatic temperature or humidity monitoring system is abnormal, the cold storage door should be closed in time, So as not to expose more air conditioners, resulting in corresponding problems in the quality of stored products. The medical cold storage project also has a self rescue system in time. If the temperature of the cold storage exceeds the limit, the system cooling system will also be turned on. When the temperature returns to normal, it can be carbonized, unlike flow burning and flashover like extruded board, which can effectively prevent fire spread. In particular, it can be sealed as a whole after systematic fire prevention treatment to form non combustible products.

2 Replies   |  until 2024-03-26 01:24:48 | 53 Views

Pultruded fiberglass cable tray 2024-03-26 10:32:14 support  0 | be opposed to  0

A good seller, even a novice, a lot of SotkamoHow much is the professional design and installation of cold storage don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of accomplishment, and finally figured out the problem that I didn’t understand.^- ^Learn more in the future!

Supply Chain Management Services 2024-03-26 08:28:23 support  0 | be opposed to  0

Happy cooperation and tight packaging. Let’s talk about business services: Like
Log inContent can only be published later